Advertising ...... EMERGENCY OPERATION...

REPUBLIC OF IRAQ
MINISTRY OF CONSTRUCTION AND HOUSING AND
MUNICIPALITIES AND PUBLIC WORKS
EMERGENCY OPERATION DEVELOPMENT PROJECT
CONSULTING SERVICES

Advertising ...... Contract Title: Construction...

German International Cooperation with Iraq
Invitation for Bids
IRAQ
German “Credit Facility to assist the Return of IDP’s” in Iraq

Through engineering and technical staff,...

Through engineering and technical staff, Directorate of roads and bridges in Karbala implement a number of tasks for emergency maintenance of roads and bridges in the province to serve people and t

Through the engineering staff in Karbala, Roads...

Through the engineering staff in Karbala, Roads and bridges directorate completed Ahmed bin Al-Qasim road in the Al-Husseinieh in long of 3 km and at a cost exceeding 762 million dinars.

Engineer Essam Abbas, the general director of...

Engineer Essam Abbas, the general director of roads and bridges directorate, meets with delegation of the World Bank to discuss the implementation of the rehabilitation of Highway NO.1\VII and VIII

Through engineering and technical staff in...

, Through engineering and technical staff in karbala , Roads -and bridges directorate on oversees maintenance Fatima al alzahra road in length 2.75 kilometer of each corridor and in width of 10 met

Tender No ( 6 / 2014 )

Ministry of Reconstruction and Housing
Advertisement of Prequalification Tender No ( 6 -2013)
Maintenance of Five Roads in Baghdad Goverenorate :-
A- Maintenance of the Road connecting Between Baghdad /Kut Road and Tigris River Dam Road (Allug Road)of (7,5) Km length Estimation Cost (900 000 000)ID (Nine Hundreds Million Iraqi Dinars)
B- Maintenance of the Road connecting Between al Nahrawan Intersection and the Area of 9 Nisan of (7) Km . Length ,Estimation Cost (660 000 0000) ID(Six Hundred Sixty Million Iraqi Dinar)
C-- Maintenance of Old Sader Alyousifiya of (6)Km .lenghth Estimation Cost (550 000 0000) ID(Five Hundred Fifty Million Iraqi Dinars)
D- Maintenance of the Road Seperated from AL Shula /Ibrahim Bin Ali Village Road Leading to Sabilbur Intersection as Sabilbur Intersection the Station (0+0) of (12)Km length ,Estimation Cost
(1 343 000 000 )ID (One million Three Hundred and FourtyThree million Iraqi Dinar)
E - Maintenance of the Road linking Between Baghdad/New Baquba Road and Kan Bani Saad side (Mohamed Sakran Road )of (14.6) Km. lenghth . Estimation Cost (1 610 000 000 )ID (One million six Hundred Ten Milions Iraqi Dinar)/
9/1/17) of investment plan)under the classification of
Specialist and experienced companies and contractors classified not less than the ( fifth ) degree by the Ministry of Planning who wish to participate in the a.m. tender have to approach the State Corporation for Roads and Bridges center in( Baghdad /Karadat Mariam /in front of Al Rasheed Hotel) to confirm their desire to participate in the tender (according to the original copy of their constructional classification card )after paying unrefundable amount of( 100 000)ID (one Hundred thousand Iraqi Dinar) provided that the following documents of technical and financial qualification should be submitted inside a closed and sealed envelope fixed on it the signature and the name , number and the closing date of the tender and handed to the secretary of tender opening committee in the SCRB center to choose the qualified of them to be invited to submit their commercial (financial)bids second stage ,
The closing date to confirm the desire for participation is 12 .0 noon of 25 / 2 / 2014 and the closing date for submitting the documents of technical and financial qualification is 12.0 noon of 26 / 2 /2014
The documents should be submitted with the tender ;-
1- A valid copy of classification card issued by Ministry of Planning
2- A valid copy of contractor union card .
3- A valid copy of company foundation certificate and contractor professional practicing certificate
4-The original clearance letter issued by the State Corporation of Taxes addressed to SCRB(valid and according to the new form)
5- A list of similar works executed by the bidder or under execusion confirmed by concerned authorities except those works with SCRB
6- plants and equipments own by the bidder as well as the proper certification confirms that taking into consideration using of modern equipments in executing roads and bridges as well as the using of modern spreaders consisting of sensors to insure safe rolling and leveling .
7- A list of the bidder staff especially the especialised technical staff proposed to be used in executing the work.
8-the documents confirm that the bidder own a new asphalt factory .
9- The last three years calculations as well as the last calculations that include expenses and revenues of the similar works submitted by the contractor provided that the numbers mentioned in them should conform the fixed originals own by the bidder and the size of the staff working with him.Those calculations should be authenticated by an authorized legal accountant
10- The voucher of receiving the tender document
11- Joint venture contract (if there is a partner) authenticated by a notary public
12- An Accommodation card .
13- A bank statement till 31/12/2013 confirmed and sealed by the bank

The website for S C R B is www.turruqjissor.imariskan.gov.iq
The Email of Tenders and Contracts Section is tenders_scrb@yahoo.com

WI/7-2/FI

Director general
Issam Abbas Mahdi

English