Advertising ...... Contract Title: Construction...

German International Cooperation with Iraq
Invitation for Bids
IRAQ
German “Credit Facility to assist the Return of IDP’s” in Iraq

Through engineering and technical staff,...

Through engineering and technical staff, Directorate of roads and bridges in Karbala implement a number of tasks for emergency maintenance of roads and bridges in the province to serve people and t

Through the engineering staff in Karbala, Roads...

Through the engineering staff in Karbala, Roads and bridges directorate completed Ahmed bin Al-Qasim road in the Al-Husseinieh in long of 3 km and at a cost exceeding 762 million dinars.

Engineer Essam Abbas, the general director of...

Engineer Essam Abbas, the general director of roads and bridges directorate, meets with delegation of the World Bank to discuss the implementation of the rehabilitation of Highway NO.1\VII and VIII

Through engineering and technical staff in...

, Through engineering and technical staff in karbala , Roads -and bridges directorate on oversees maintenance Fatima al alzahra road in length 2.75 kilometer of each corridor and in width of 10 met

Minister of Construction and Housing and public...

Minister of Construction and Housing and public Municipalities Tariq AL-kikhany opened two bridges in province of Al-muthanna.

Japanese Loan

  1. Information on the Loan Agreement:

Signing Agreement Date: 25 January 2008

Agreement Effective Date: 30 June 2008

Amount of Loan:M3,348¥

Period to pay off the loan: 40 years

Type of loan: soft loan

 

2 Information on the Project:

Project Name:Al-Samawa Roads and Bridges Construction Project

Project Location:Al-Muthanna Province

3 Project Summary: Construction of three roads and bridges in al-Samawa

  1. Al-Samawa North Concrete Bridge spanning Euphrates, with the ramps (new construction)
  2. Al-Hilal Concrete Bridge spanning Euphrates, with the ramps (replacement of the floating bridge)
  3. Al-Mehdy Concrete Bridge spanning Euphrates, with the ramps (replacement of the beam bridge)

 

4 Project Components: Construction of three concrete bridges, as follows:

 

Bridge Name

Bridge Length

Length of Ramps

Bridge Location

a-

Al-Samawa North Concrete Bridge, with ramps

240 m

1250 m

Al-Samawa Metropolitan City, spanning Euphrates

b-

Al-Mehdy Concrete Bridge, with ramps

192 m

391 m

North al-Samawa City, spanning al-Atshan river

c-

Al-Hilal Concrete Bridge, with ramps

192 m

500 m

Center Township, Al-Hilal, spanning Euphrates

 

5 Contracts Status

Contract Name

Execution Body

Contract Price

(USD)

Term of Contract

(Month)

Contract Signing Date

Contract Effective Date

a- Consultancy Service

DPI KONSULT

(Malaysian)

2,283,144.00

48

04/12/2009

22/06/2010

b- Basic Component

(Civil Works)

DAAR Engineering Inc. & Burj Al-Emeer Co.

(JV)

25,422,971.85

26

25/08/2011

20/10/2011

 

attached [en:field:field_attached:page:label]: