دائرة الطرق والجسور

استمرار العمل في مشروع انشاء التقاطعات المجسرة لمقتربات جسر الهندية الثاني

دائرة الطرق والجسور

التقى المهندس علي عبد الواحد مدير عام دائرة الطرق والجسور رئيس فريق القرض الالماني
بوفد ادارة مشاريع قرض بنك التنمية الالماني kfw وبرفقتهم خبير الالغام المعين من البنك الالماني

داىرة الطرق والجسور تنجز الطبقة الرابطة لطريق...

داىرة الطرق والجسور تنجز الطبقة الرابطة لطريق المرور السريع رقم /1 الجزء ط6

Advertising ...... EMERGENCY OPERATION...

REPUBLIC OF IRAQ
MINISTRY OF CONSTRUCTION AND HOUSING AND
MUNICIPALITIES AND PUBLIC WORKS
EMERGENCY OPERATION DEVELOPMENT PROJECT
CONSULTING SERVICES

Advertising ...... Contract Title: Construction...

German International Cooperation with Iraq
Invitation for Bids
IRAQ
German “Credit Facility to assist the Return of IDP’s” in Iraq

Through engineering and technical staff,...

Through engineering and technical staff, Directorate of roads and bridges in Karbala implement a number of tasks for emergency maintenance of roads and bridges in the province to serve people and t

Directorates of Roads & Bridges

ROADS Network:
Kirkuk Roads and bridges Directorate :
Supervising the projects financed by the Commission budget -
Within regional development projects plan : -
• overseeing ( 47 ) projects - (Plan + maintenance) with a cost of (67,942,929.550) Iraqi dinars.
• Implementation of 3 bridges and sub-bridges with a cost of 7.5 billion dinars.
• design of bridges with soil investigation with a cost of 0.5 billion dinars.
• Maintenance of the intersection of Kirkuk - Erbiwith an amount of one billion dinars.

Baghdad Roads Directorate :
Supervising the projects within the allocations (budget plan).

Highways
Supervising the projects within the allocations (budget plan).

Salahiddeen Roads & Bridges directorate :
Supervising the projects in the Governorate financed by the Commission budget , 500 Km roads have been implemented using the regional development budget .

Diala Roads and bridges Directorate :
Supervising the projects in the Governorate financed by the Commission budget
using the regional development budget : -
• (633) km roads .
• (4) bridges.
• Implementation of 2 box style canals.
• Implementation of one slop bridge .

Muthanna Governorate Roads and bridges Directorate :
Supervising the projects in the Governorate financed by the Commission budget
using the regional development budget : -
• paving roads length of 96.5 km.
• Paving and maintenance of 39.25 km.
• Rehabilitation and Cleaning 243.5 km.
• Implementation of Al-Shuhada'a and Al-Swere bridges .

Al-Anbar roads and bridges Directorate ;
Supervising the projects of the allocations financed by the Commission (maintenance plan ) .
Within regional development financing plan : -
• ( 781 ) km.roads .
• The number of bridges executed ( 4 ) Bridge ..
• total cost of the implementation of roads and bridges ( 94.726 ) billion dinars.
Babil Roads & bridges directorates;
Supervising the projects of the allocations financed by the Commission ( with maintenance plan ) .
projects funded by the Governorate : -
• ( 700.292 ) km roads.
• Implementation of ( 5 ) bridges re-design of the Pepsi - Cola Bridge .
AL-Najaf roads :
Supervising the projects of the allocations financed by the commission ( with maintenance plan ) .
Within regional development projects : -
• preparing surveys and designs , drawings and speculative statements along rural roads (34.5) km .
• preparing surveys and designs , drawings and speculative statements and supervision of a number of bridges ( 2).

KERBALA roads and bridges :
Supervising the projects of the allocations financed by the commission ( with maintenance plan ) .
using regional development projects budget : -
• total length of roads executed ( 32.850 ) km at a cost of ( 8,389,247 000) dinars .
• road projects ( direct implementation ) total length of 23 km at a cost of ( 6,181,504,000 ) dinars .
• pedestrian bridges crossing / 2 .

Roads and bridges of Dhi Qar:
Supervising the projects of the allocations financed by the commission ( with maintenance plan ) .
Using regional development projects budget : -
§ total number of projects (36) projects, " including roads paved with a length of 315 km and installed gravel the ways a length of 204 km and (3) bridges and maintenance of v ( 4) bridges.

Roads and bridges of Basra :
Supervising the projects of the allocations financed by the commission ( with maintenance plan ) .
Within regional development projects budget : -
• total length of roads executed ( 96.5 ) km.
• ( 20 ) Bridge .