Through engineering and technical staff, Directorate of roads and bridges in Karbala implement a number of tasks for emergency maintenance of roads and bridges in the province to serve people and t

Through the engineering staff in Karbala, Roads...

Through the engineering staff in Karbala, Roads and bridges directorate completed Ahmed bin Al-Qasim road in the Al-Husseinieh in long of 3 km and at a cost exceeding 762 million dinars.

Engineer Essam Abbas, the general director of...

Engineer Essam Abbas, the general director of roads and bridges directorate, meets with delegation of the World Bank to discuss the implementation of the rehabilitation of Highway NO.1\VII and VIII

Through engineering and technical staff in...

, Through engineering and technical staff in karbala , Roads -and bridges directorate on oversees maintenance Fatima al alzahra road in length 2.75 kilometer of each corridor and in width of 10 met

Minister of Construction and Housing and public...

Minister of Construction and Housing and public Municipalities Tariq AL-kikhany opened two bridges in province of Al-muthanna.

Completed Projects

No. Project Name Province Commencement Date Execution Date Planned Execution Rate Actual Execution Rate
1.       Second Lane Al-Rifa’y Qal’at Sukar Thi Qar 11-05-08 41180 100% 100%
2.       Second Lane Al-Nasr – Al-Rifa’y Thi Qar 09-09-07 11-05-12 100% 100%
3.       Rehabilitation of Albo-Hamza – Al-Hawas Road of Al-Rifa’I District, 8-km long, in Thi Qar Province Thi Qar 10-10-12 03-10-13 100% 100%
4.       Nasiriya – Amara Weigh Station Thi Qar 40810 41468 100% 100%
5.       Second Lane of Al-Khales – Al-Adhaim Road Diyala 11-01-10 26/03/2014` 72% 100%
6.       Second Lane Ba’qouba – Khales 11 km Diyala 39800 40954 100% 100%
7.       Al-Kelabeen Bridge Wasit 07-01-12 41293 100% 100%
8.       Kut – Shaikh Sa’ad Weight Dtation Wasit 40802 41412 100% 100%
9.       Kut – Mwafaqiya Weight Dtation Wasit 40802 08-03-13 100% 100%
10.     Kut – Mwafaqiya Weight Dtation Wasit 40802 41482 100% 100%
11.     Kut – Al-Swaira Weight Dtation Wasit 40802 41441 100% 100%
12.     Bridge on Al-Tarmiya –Abaychi Road 40 m long Baghdad 40996 41146 100% 100%
13.     Al-Fajr Concrete Bridge Al-Qadisiya 01-08-00 07-02-13 100% 100%
14.     Al-Dahma Rural Road of 12.7 km long Al-Qadisiya 01-09-00 39994 100% 100%
15.     Rehabilitation of 23 km of Kmait – Al-Fajr Road Meesan 08-05-12 41322 100% 100%
16.     Al-Teeb Station Meesan 08-07-11 04-09-13 100% 100%
17.     Al-Azair Weigh Station Meesan 08-07-11 -- 100% 100%
18.     Execution of the visitors’ road Najaf – Kerbala Najaf 09-10-12 11-01-12 100% 100%
19.     Reconstruction of the expressway bridge / Shat al-Basra Al-Basra 38186 38947 100% 100%
20.     Um-Qasr –Al-Zubair Weigh Station Al-Basra 40927 41474 100% 100%
21.     Al-Zubair – Basra Weigh Station Al-Basra 40877 41479 100% 100%
22.     Basra – Fao Weigh Station Al-Basra 40813 41388 100% 100%
23.     Al-Samawa – Nasiriya Weigh Station Al-Muthanna 08-07-11 41386 100% 100%
24.     Al-Samawa – Dewaniya Weigh Station Al-Muthanna 08-07-11 41444 100% 100%
25.     Al-Samawa – Najaf Weigh Station Al-Muthanna 08-07-11 41413 100% 100%
26.     Execution of Second Lane of Diwaniya – Samawa Road Al-Diwaniya 40387 41020 100% 100%
27.     Line marking the middle of the left Lane of the Expressway Ta’/6 Diwaniya Al-Muthanna Thi Qar 41210 41295 100% 100%