Advertising ...... EMERGENCY OPERATION...

REPUBLIC OF IRAQ
MINISTRY OF CONSTRUCTION AND HOUSING AND
MUNICIPALITIES AND PUBLIC WORKS
EMERGENCY OPERATION DEVELOPMENT PROJECT
CONSULTING SERVICES

Advertising ...... Contract Title: Construction...

German International Cooperation with Iraq
Invitation for Bids
IRAQ
German “Credit Facility to assist the Return of IDP’s” in Iraq

Through engineering and technical staff,...

Through engineering and technical staff, Directorate of roads and bridges in Karbala implement a number of tasks for emergency maintenance of roads and bridges in the province to serve people and t

Through the engineering staff in Karbala, Roads...

Through the engineering staff in Karbala, Roads and bridges directorate completed Ahmed bin Al-Qasim road in the Al-Husseinieh in long of 3 km and at a cost exceeding 762 million dinars.

Engineer Essam Abbas, the general director of...

Engineer Essam Abbas, the general director of roads and bridges directorate, meets with delegation of the World Bank to discuss the implementation of the rehabilitation of Highway NO.1\VII and VIII

REPUBLIC OF IRAQ
MINISTRY OF CONSTRUCTION AND HOUSING AND
MUNICIPALITIES AND PUBLIC WORKS
EMERGENCY OPERATION DEVELOPMENT PROJECT
CONSULTING SERVICES
CONSTRUCTION SUPERVISION FOR AL-KHALIS-ADHEEM ROAD

Loan No. 8520-IQ
ProjectIDNo.P155732
Procurement reference number: MOCHPM/C7
Expressions of interest

Through engineering and technical staff, Directorate of roads and bridges in Karbala implement a number of tasks for emergency maintenance of roads and bridges in the province to serve people and the visitors.
The directorate acts skimming for a part of the major road to the Ain al-Tamer, starting from Al-Ukhaydir to the scattered places with a total length of 250 meters, to repair a damage area till a road of Al-Tar which effects on the safety of passable.

Through the engineering staff in Karbala, Roads and bridges directorate completed Ahmed bin Al-Qasim road in the Al-Husseinieh in long of 3 km and at a cost exceeding 762 million dinars.
The work included the establishment ascend a dirt road and sprinkled two layers of gravel after the lifting of the symptoms
(water and electricity supply and raise the planted on road) after covering the road with a layer of bitch foundation with 6 meters and thickness of 10 cm , as well as brushes and install the shoulders.

Introduction

Introduction
The network of roads and bridges in all countries of the world is a measure of the evolution of civilization in these countries; it also reflects the development of the infrastructure of the country and is considered as one of the most important pillars of economic development.
In light of this worldwide development in this field , the General Authority for Roads and Bridges in Iraq , Always and through its well-experienced staff of engineering and technical personnel, are working to develop a network of roads and bridges in Iraq and rehabilitating the roads and bridges exposed to damage or negligence over the past years under the full supervision, leadership and follow-up from His Excellency the Minister of Construction and Housing, to improve the State capabilities to provide services to citizens to a level that pleases God and satisfies people.